We rehabilitated 44,505 linear feet of existing 8-inch diameter sewer mains, 38 manholes, 992 sewer laterals. We also replaced 20 manholes and installed 35 cleanouts.
Projects
La Costa Pressure Reducing Station Replacement Project
/ janja
We installed a new prefabricated pressure reducing station and appurtenances inclusive of geotextile placement.
Cuyamaca College Water/Wastewater Outdoor Water Distribution System
/ janja
We built a demonstration site that encompassed a mock water distribution system. The site provides hands-on training for students learning Water/Wastewater Technologies at Cuyamaca College.


