We rehabilitated 44,505 linear feet of existing 8-inch diameter sewer mains, 38 manholes, 992 sewer laterals. We also replaced 20 manholes and installed 35 cleanouts.
We built a demonstration site that encompassed a mock water distribution system. The site provides hands-on training for students learning Water/Wastewater Technologies at Cuyamaca College.